Example of the Auger Rod failure [SA-20]
Product number: | SA-20 |
---|---|
Dealers: | 想アーキテクツ |
File: | mp4 |
Replay time: | About 1 minute |
Product Information of "Example of the Auger Rod failure"
Problems that plague the field in pile construction is underground obstacles, such as on a Boulder.

Contains the corruption examples of Rod seemed bored pile PHC with this content per vibration occurring in construction by pre-boring process on a large Boulder, and a long continuous load operations. Describes waveform feature hit the underground obstacles and the correlation integral current value and N value of the other.
Popular item in the genre of "Architecture"
Page:
Page:
Popular item in the same shop
Page:
Page: